Spring/Summer 2020

Pattern #4 Foundation

Pattern #4 Foundation

Shown on page 40, instructions begin on page 66.
Updated: 02Aug2020

Correction is underlined.

In Finishing, after waistband is complete, sew right side seam.

Pattern #6 Elemental

Pattern #6 Elemental

Shown on page 41, instructions begin on page 68.
Updated: 29May2020

Correction is underlined.

Chart repeat is Rows 3–10, see revised chart here.[PDF 91KB]

Work in chart through row 10, then rep rows 3–10 until piece measures 64"/162.5cm, then work rows 1 and 2 once more.

Pattern #11 Cable Trellis Dress

Pattern #11 Cable Trellis Dress

Shown on page 48, instructions begin on page 75.
Updated: 17Aug2020

Corrections are underlined.

Back Row 1 (RS) [P1, k1] 0 (0, 1, 3, 6, 8) times, [p1, k2] 0 (1, 1, 1, 1, 1) time, work row as written to next bracket, [k2, p1] 0 (1, 1, 1, 1, 1) time, [k1, p1] 0 (0, 1, 3, 6, 8) times.

Pattern #13 Ripple Dress

Pattern #13 Ripple Dress

Shown on page 51, instructions begin on page 77.
Updated: 02Aug2020

Corrections are underlined.

Revised Measurements
Bust 32 (39, 46)"/81 (99, 117)cm
Hip 34 (41, 48)"/86.5 (104, 122)cm
Note about fit: Pattern stitch creates a very stretchy fabric.

Gauge Swatch
Row 1...rep from * across, ending last rep at **, cont to end as written.

Yoke
Rnd 5...*(dc in next st) 3 times, (sk next st, dc in next st) 4 times, (dec in next st) twice**, cont to end as written.

Last Rnd before Divide for Armholes should be Rnd 12.
Numbering then begins again with a Rnd 11 after division, follow existing numbering to the end.