60 NEW PATTERNS AVAILABLE NOW!

Winter 2006/07

Pattern #2, Cabled Bolero

photo on page 69, instructions on page 105 

Corrections are underlined.

This garment is not close-fitting; it was incorrectly described in the copy on page 105. The sleeve is the only close-fitting part of this garment.

FINISHING

Replace the end of the last paragraph with the following clarification:

…Cont in pat until left edge of collar (end of RS rows) fits along first row of pentagons in body—1 st of body to 1 row of collar. Bind off. Sew collar in place. Sew button to end of collar, opposite buttonhole.

Pattern #3, Cropped Raglan Jacket

photo on page 70, instructions on page 106 

Corrections are underlined.

NECK

Row 3 K1, M1 (neck inc), [k to marker, sl m, yo, k1, yo, knit to 1 st before next marker, yo, k1, yo, sl m] twice, k to last st, M1(neck inc), k1—36 (38, 42, 44) sts.
Row 4 Purl.

Rep rows 3 and 4 twice more—56 (58, 62, 64) sts. Cast on 2 (3, 4, 5) sts at beg of next 2 rows AT SAME TIME, rep rows 3 and 4 once more—70 (74, 80, 84) sts.

Next row [K to marker, sl m, yo, k1, yo, knit to 1 st before next marker, yo, k1, yo, sl m] twice, k to end—78 (82, 88, 92) sts.
Next row Purl.

Rep the last 2 rows 3 (4, 5, 6) times more—102 (114, 128, 140) sts.

Continue in pattern as written.

Pattern #4, Cabled Pullover

photo on page 71, instructions on page 107. 

Correction is underlined.

STITCH GLOSSARY
9-st LC should have been identified as 9-st LPC.
Correction has been made on Body Chart stitch key.

FINISHING
Turtleneck
With RS facing and circular needle, pick up and knit 54 sts evenly around neck edge. Join and work in k4, p2 rib for 4″/10cm, inc 12 sts evenly on last rnd—66 sts.

Pattern #5, Cable/Bobble Pullover

photo on page 72, instructions on page 108.

Updated: 17Feb2011 

Corrections are underlined.

KNITTED MEASUREMENTS
Length 20½ (21¼, 22)”/52 (54, 56)cm

Measurements shown on the schematic drawing are incorrect.
Overall length should read 20½ (21¼, 22)”.
Measurement for shaped lower edge should read 2″ for all sizes.
Measurement between shaped lower edge and armhole should read 9 ¾” for all sizes.
Measurement for armhole should read 8¾ ( 9½ , 10¼)”.

9-st Cable
Rows 1 & 3 (RS) K9.
Row 2 and all WS rows P9.
Row 5 6-st LC, k3.
Rows 7 & 9 K9.
Row 11 K3, 6-st RC.
Row 12 P9.
Rep rows 1-12 for 9-st cable.

FRONT

Cast on 53 sts.
Row 1 (RS) K2, p2, k16, p2, k9, p2, k16, p2, k2.
Row 2 Cast on 6 sts, p8, k2, p16, k2, p9, k2, p16, k2, p2 – 59 sts.
Row 3 Cast on 6 sts, k8, p2, k16, p2, k9, p2, k16, p2, k8 – 65 sts.

Size S only
Next row (WS) K the knit sts and p the purl sts.

Size M and L only
Next row (WS) Cast on (3, 6) sts, k the cast-on sts, then k the knit st and p the purl sts – (68, 71) sts.

All sizes
Next row (RS) Cast on 0 (3, 6) sts, p the cast-on sts, then k8 (11, 14), p2, k2, B4, k6, B2, k2, p2, [6-st, k3 LC(Row 5 of 9-st Cable)], p2, k2, B2, k6, B4, k2, p2, k8 (11, 14) – 65 (71, 77) sts.
Next row K the knit sts and p the purl sts.

Beg elongated cables
*Next row (RS) K8 (11, 14), p2, with spare needles k next 8 sts holding to front of work. Turn work, p8.
Work 8 more St st rows over these 8 sts, then sl to holder to be joined to work later.
Cut yarn. Rejoin yarn and knit next 8 sts on LH needle – 18 (21, 24) sts on RH needle. Turn work. Work these 18 (21, 24) sts as established for 3 more rows.

Next joining row (RS) Work across first 18 (21, 24) sts, k8 sts from holder, return to sts on LH needle and p2, k9, p2, k8, sl next 8 sts to holder in front of work, p2, k8 (11, 14).

Next row (WS) P8 (11, 14), k2, p8. Turn work.
Work these 18 (21, 24) sts as established for 2 more rows.
Sl 8 sts on holder to spare needle, join yarn, beg with a RS row and work in St st for 9 rows, ending with a RS row. Cut yarn. Turn work.

Next joining row (WS) Return to 18 (21, 24) sts already on RH needle, with that yarn, p 8 sts from spare needle, then knit the k sts and purl the p sts across rem of row.

Next row (RS) K2 (5, 8), B4, k2, p2, k3, B3, k5, B3, k2, p2, k9, p2, k2, B3, k5, B3, k3, p2, k2, B4, k2 (5, 8). Work 1 row on WS over all sts.

Rep from *, continuing 9-st cable over center 9 sts, and working all bobbles in the same sequence as the sleeves, AT SAME TIME, when 10 rows have been worked above last cast-on row on the side 10 (13, 16) sts, beg incs and decs as for back. When same length as back to armhole, shape armhole as for back…..continue in original pat as written.

Pattern #7, Patchwork Skirt

photo on page 74, instructions begin on page 110 

Corrections are underlined.

BACK
CORSET YOKE

Cont to foll chart (with decreased purl sections) through row 36.

Next (dec) row (RS) Work in pats, and (SKP, k1) in each of the 6 ladder sections—98 (110) sts.
Work even in pats for 13 more rows, with the rem sts in each ladder section worked in St st.
Next (dec) row (RS) Work in pats and SKP in each of the 6 ladder sections, and SKP in the center k2 section—91 (103) sts.
Work even in pats for 3 more rows, with the rem st in each ladder section worked in St st.
Next (dec) row (RS) Work in pats and p2tog in each of the 12 purl sections that separate the pats—79 (91) sts.
Work even in pats for 5 more rows.
Next (dec) row (RS) P2tog at each end.
Work 1 row even.
Next (dec) row (RS) P1, SKP, work to last 3 sts, k2tog, p1. Rep dec row every other row twice more—71(83) sts. Bind off.

Pattern #18, Knit/Crochet Top

photo on page 89, instructions on page 122 

Corrections are underlined.

GAUGES

32 sts and 48 rows = 4”/10cm over tuck pat using size 1(2.5mm) needles.

TUCK PATTERN

Row 1 (purl side) is a RS row.

When working Rows 6 and 12 (WS), insert RH needle from front to back into the center of the st 4 rows below, not counting row on LH needle. Draw thru a loop of yarn from back to front, leave on RH needle to form tuck st. Allow the sts above to unravel, there will be 4 strands supported by the tuck st on the RS of work.

BACK BODICE

Increase directions are incomplete; replace with underlined text below.

With size 1 (2.25mm) needles, cast on 113 (125, 143, 155) sts. Work in tuck pat, inc 1 st each side (working inc sts into pat) on the 8th (6th, 4th, 4th ) row, then every 10 (8, 8, 8) rows 3 (4, 5, 5) times more—121 (135, 155, 167) sts. Work even until…

Pattern #24, Cabled Coat

photo on page 95, instructions begin on page 129 

Corrections are underlined.

1. BACK
The number of selvage sts is incorrect; it should be 4 selvage sts as follows:
Note When working all shaping…….dec’ing and inc’ing inside of these 4 selvage sts.

2. LEFT FRONT
The front edge st must be slipped as follows:
With 2 strands of yarn, cast on 71 (75) sts. Beg with a k1, work in k1, p1 rib for 1 1/4″/3cm, AT THE SAME TIME sl the first st of every WS row.

3. SLEEVES
The increases for the size large are incorrect; replace with the following:
With 2 strands of yarn…….Work in chart pat, inc 1 st each side every 4th row 17 times, every other row 0 (3) times—85 (91) sts.

Pattern #25, Color Block Dress

Photo on pages 92 & 93, instructions begin on page 127 

Corrections are underlined.

BODY
Foundation row (WS) Sc in 2nd ch from hook and in each ch to end – 109 (117, 125, 133) sts. Work in…..

Pattern #27, Floral Sweater

photo on page 99, instructions on page 133 

Corrections are underlined.

KNITTED MEASUREMENTS

Length 24½ (26, 27, 28, 29½)”/62 (73.5, 68.5, 71, 75)cm

BACK

With A, cast on 80 (85, 90, 90, 95) sts.
Row 1(RS) *K3, p2; rep from * to end. Cont in k3, p2 rib for 3″/7.5cm, dec 0 (dec 1, dec 2, inc 2, inc 1) st on last WS row—80 (84, 88, 92, 96) sts. Cont in St st for 0 (4, 6, 8, 12) rows.
Beg chart pat
Beg on row 1 of body chart [adding 0 (2, 4, 6, 8) sts to each side of chart in A], work foll chart pat until piece measures approx 18 (18½, 19, 19½, 20)”/45.5 (47, 48, 49.5, 50.5)cm from beg, end with WS row.

SLEEVES

With A, cast on 30 (35, 40, 40, 45) sts. Work in k3, p2 rib for 12 rows, inc 0 (1, 0, 0, 1) st on the last row—30 (36, 40, 40, 46) sts. Work in St st, begin on row 1 of sleeve chart [center chart by adding 0 (3, 5, 5, 8) sts to each side of chart in A] and inc 1 st each side every 4th row 6 times, every 6th row 6 (0, 0, 7, 6) times, every 8th row 0 (5, 5, 0, 0) times—54 (58, 62, 66, 70) sts. Work even until piece measures approx 15 (15, 15½, 16, 16½)”/38 (38, 39.5, 41, 41)cm from beg.

Click here to download a PDF of the complete instructions with revised schematic. [PDF 43KB]

Pattern #28, Cap Sleeve Cardigan

photo on page 100, instructions begin on page 133 

The color used for each sleeve was omitted.

SLEEVES

Make the right sleeve in MC, the left sleeve in A.

Please note: Neckline shaping is not shown on Right Front and Left Front charts.

Print Friendly, PDF & Email