60 NEW PATTERNS AVAILABLE NOW!

Early Fall 2015

Pattern #3, Tubular Scarf

Photo on pages 43, instructions begin on page 73.
Updated: 16Jun2016

Cables were reversed in second half of side cable panel.

Side Cable Panel
Rnd 13 5-st LPC, p3, k8, p3, 5-st RPC.
Rnd 15 P1, 5-st LPC, p2, k8, p2, 5-st RPC, p1.
Rnd 17 P2, 5-st LPC, p1, k8, p1, 5-st RPC, p2.
Rnd 19 P3, 5-st LPC, 8-st LC, 5-st RPC, p3.

Pattern #5, Open-Front Cardigan

Photo on pages 46, instructions begin on page 74.
Updated: 15Jul2015

Instructions for completing the shawl collar were omitted. The fronts should be completed as follows:

Left Front: Work even in pats as established until armhole measures 7 ½ (8, 8 ½, 9, 9 ½)”/19 (20.5, 21.5, 23, 24)cm, end with a WS row.
Next row (RS) Bind off 20 (23, 25, 30, 32) sts for shoulder, cont in rib over rem 36 sts for shawl collar extension for 3 (3, 3 ¼, 3 ½, 3 ½)”/7.5 (7.5, 8, 9, 9)cm. Place sts on st holder.

Right Front:
Work even in pats as established until armhole measures 7 ½ (8, 8 ½, 9, 9 ½)”/19 (20.5, 21.5, 23, 24)cm, end with a RS row.
Next row (WS) Bind off 20 (23, 25, 30, 32) sts for shoulder, cont in rib over rem 36 sts for shawl collar extension for 3 (3, 3 ¼, 3 ½, 3 ½)”/7.5 (7.5, 8, 9, 9)cm. Place sts on st holder.

Finishing
Graft ends of shawl collar extensions together. Sew edge of extensions in place along back neck edge.

Pattern #14, Cabled Pullover

Photo on pages 57, instructions begin on page 83.
Updated: 24May2017

In chart row 7, sts 26 and 27 should be a 2-st LPC, not a 2-st LPT as shown.

Pattern #16, Pullover with V-Inset

Shown on page 60, instructions begin on page 85.
Updated: 17Jan2018

Correction is underlined.

Back, just before armhole shaping: …work the 2 dec rows between +’s—95 (103, 111) sts.

Pattern #19 V-Neck Cardi

Photo on pages 63, instructions begin on page 90.
Updated: 16Nov2015

Correction is underlined.

Cap shaping
Dec row (RS)
Ssk, k to last 2 sts, k2tog.

Print Friendly, PDF & Email