60 NEW PATTERNS AVAILABLE NOW!

Holiday 2019

Pattern #1, Victoriana

Photo on page 36, instructions begin on page 67.
Updated: 14Dec2019

Instructions for Make Bobble (MB) were inadvertently omitted from the Stitch Glossary.

Make Bobble (MB) (K1, p1, k1, p1, k1) into next st, turn, p5, turn, ssk, k1, k2tog, turn, p3, turn, SK2P. Push bobble to RS of work.

Pattern #2, Marilla

Photo on pages 45 and 46, instructions begin on page 68.
Updated: 14Dec2019

Corrections are underlined.

Materials
Aereo should be B and 220 Superwash Aran should be A.

Turtleneck
Join and work in k1, p1 rib for 7.5″/19cm.

Pattern #4, Wallaby

Photo on pages 43 and 44, instructions begin on page 68.
Updated: 06Jan2019

Corrections are underlined.

Displacement/inc row 3 (RS) K2, kfb, k to 2 sts before the 4-st detail, k2tog, work the 4-st detail, kfb, k to 1 st before the 4 st detail, M1L, k1, work the 4-st detail, SKP, k to the last 4 sts, kfb, k3—2 sts inc’d.

Front, Join pocket lining to front
Section between *’s: p1 from back needle tog with 1 st from front, insert RH needle into next st on front needle and k it tog with next st on back needle, do not drop from needle, knit the next st on front needle tog with same st on back needle (that is, 2 sts on front needle are worked with 1 st on back needle), p1 st tog on back needle tog with 1 st from front needle*

Finishing
Sew base of pocket on WS of front.

Pattern #15, Veste La Pivoine

Photo on page 60, instructions begin on page 86.
Updated: 17Mar2020

A revised chart 3 is posted here. [PDF 299KB]

Print Friendly, PDF & Email