60 NEW PATTERNS AVAILABLE NOW!

Spring/Summer 2020

Pattern #4, Foundation

Shown on page 40, instructions begin on page 66.
Updated: 02Aug2020

Correction is underlined.

In Finishing, after waistband is complete, sew right side seam.

Pattern #6, Elemental

Shown on page 41, instructions begin on page 68.
Updated: 29May2020

Correction is underlined.

Chart repeat is Rows 3–10, see revised chart here.[PDF 91KB]

Work in chart through row 10, then rep rows 3–10 until piece measures 64"/162.5cm, then work rows 1 and 2 once more.

Pattern #7, Zaffre

Shown on page 44, instructions begin on page 69.
Updated: 14Jan2021

A corrected chart for the Lace Band Trims is posted here. [PDF 125KB] Text in pattern is correct.

Pattern #11 Cable Trellis Dress

Shown on page 48, instructions begin on page 75.
Updated: 17Aug2020

Corrections are underlined.

Back Row 1 (RS) [P1, k1] 0 (0, 1, 3, 6, 8) times, [p1, k2] 0 (1, 1, 1, 1, 1) time, work row as written to next bracket, [k2, p1] 0 (1, 1, 1, 1, 1) time, [k1, p1] 0 (0, 1, 3, 6, 8) times.

Pattern #13, Ripple Dress

Shown on page 51, instructions begin on page 77.
Updated: 30Sep2020

Corrections are underlined.

Revised Measurements
Bust 32 (39, 46)"/81 (99, 117)cm
Hip 34 (41, 48)"/86.5 (104, 122)cm
Note about fit: Pattern stitch creates a very stretchy fabric.

Gauge Swatch
Row 1…rep from * across, ending last rep at **, cont to end as written.

Yoke
Rnd 5…*(dc in next st) 3 times, (sk next st, dc in next st) 4 times, (dec in next st) twice**, cont to end as written.

Last Rnd before Divide for Armholes should be Rnd 12.
Numbering then begins again with a Rnd 11 after division, follow existing numbering to the end.

Divide for armholes
Count 38 (38, 57) sts from start of rnd, pm in this st. Cont around and count 38 sts from marker and pm in this st. Now starting at end of rnd, count 38 (57, 57) sts from end of rnd, pm in this st. Cont in same direction, count 38 sts from marker and pm in this st. You have now marked off 76 (95, 114) sts for front and back and 38 sts for each sleeve.

Pattern #18, Tweed Chevron Pullover

Shown on pages 60 and 61, instructions begin on page 83.
Updated: 30Sep2020

A corrected chart, with a 6-st repeat, is posted here. [PDF 455KB]

Corrections are underlined.

Under beg chart pat
Row 1 (RS) Work the 6-st rep for 26 (28, 29, 30, 32) reps foll chart row 1, work first 5 (1, 3, 5, 1) sts once more.

Print Friendly, PDF & Email