60 NEW PATTERNS AVAILABLE NOW!

Early Fall 2011

Pattern #7, Mohair Lace Dress

Photo on pages 50 and 51, instructions begin on page 82.
Updated: 06Jun2011

Please note this underlined correction to the yardage of the following yarn.
The number of hanks required for the project remains the same.

MATERIALS
Artyarns Beaded Mohair (silk with glass beads/mohair) 1 ¾oz/50g hanks (each approx 170 yd/155m)

Pattern #8, Sheath and Wrap

Photo on pages 52 and 53, instructions begin on page 84.
Updated: 03Oct2012

Correction is underlined.

FRONT

Short-rows
Row 1 (RS) K1, sm, *k14, w&t, p6, w&t, k9, w&t, p12, w&t, k15, w&t, p18, w&t, k20; rep from * 3 (3, 4, 4) times more, end k1, sm, k1.
Next row Purl to end of row, remove markers and hide wraps.
Dec row (RS) K2, pm, ssk, k20 (20, 27, 27), pm, ssk, k39 (39, 47, 47), k2tog, pm, k20 (20, 27, 27), k2tog, pm, k2—87 (87, 109, 109) sts.
Work 5 rows in St st.
Dec row (RS) K2, sm, ssk, k to marker, sm, ssk, k to 2 sts before marker, k2tog, sm, k to 2 sts before marker, k2tog, sm, k2—83 (83, 105, 105) sts.
Rep last 6 rows 2 (4, 1, 3) times more—75 (67, 101, 93) sts.

Pattern #15, Cropped Pullover

Photo on page 60, instructions begin on page 93.
Updated: 25Feb2013

Correction is underlined.

Double dec row (RS) K3, p1, k2sp, k to last 7 sts, SK2P, p1, k3—2 sts dec’d each side.

Pattern #17, Tapered Pullover

Photo on page 61, instructions begin on page 94.
Updated: 10Jun2011

LACE MESH
(mult of 3 sts)
Row 1 (RS) K2, *yo, sl 1, k2, pass slipped st over each of the 2 sts just knit; rep from *, end k1.
Rows 2 and 4 Purl.
Row 3 K1, *Sl 1, k2, pass slipped st over each of the 2 sts just knit, yo; rep from *, end k2.

Pattern #22, Lace Jacket

Photo on page 67, instructions begin on page 100.
Updated: 02Dec2013

Corrections are underlined.

Please note this underlined correction to the yardage of the following yarn.
The number of hanks required for the project remains the same.

1. MATERIALS
Artyarns Beaded Mohair (silk with glass beads/mohair) 1 ¾oz/50g hanks (each approx 170 yd/155m)

2. page 101
When row 22 is complete, there will be 179 sts.

3. Lower Border
Next row (RS)
K3, work diamond st 12 times across as foll: *[Kfb, k3, ssk, turn, sl 1, k4, turn] 3 times, kfb, k3, ssk; rep from * to last 3 sts, k3.

Pattern #25, Cabled Poncho

Photo on page 70, instructions begin on page 103.
Updated: 16Aug2011

Page 104
A revised chart #2 has been posted. Click here to download.

Pattern #28, Colorwork Poncho

Photo on page 73, instructions begin on page 106.
Updated: 17Oct2011

1. MATERIALS
The color names and numbers of Pear Tree Yarn Supersoft 10-ply (wool) have changed as follows:
#305 natural (MC) is now #301 Egg Shell (MC)
#302 denim (CC) is now #208 Blueberry (CC)

2. A corrected chart has been posted. Click here to download. [PDF 27KB]

Print Friendly, PDF & Email